Activities

WE providing the following details :

  • Load flow studies

  • Selection of HV/LV switchgear, motor control centers

  • Selection of AC/DC UPS

  • Selection of power / distribution transformers

  • Selection of electrical equipments in hazardous area

  • Designing supply change over schemes for incoming and outgoing feeder control schemes

  • Selection of feeder /motor / transformer protection relays

  • Switchyard / transformer layouts

  • Switchgear / MCC room / battery room layout

  • Cable tray / trench layouts

  • Cable routing/ earthing layouts

  • Lighting (indoor/outdoor) layouts

  • Lightning protection layouts

  • Power and control cable schedules and cable drum schedules

  • SCADA I/O list

  • Interface activities with civil / machinery / instrumentation

  • Electrical data input for packaged equipments

  • Requisition/specifications for HV/LV switchgear, motor control centre, MV/LV motors, power / distribution transformers, lighting / small power distribution boards, AC / DC UPS, lighting fixtures, power / control cables, cable trays, earthing materials, etc.

  • Bill of quantities for bulk materials

  • Standard installation drawings for power system, earthing system, lighting system and cable tray/ladders, etc.

  • Review of vendor bids and issue technical bid analysis

  • Review of vendor drawings and issue of approvals for manufacturing

  • Preparation of interconnection diagrams between various equipments

  • Attending SAFOP / HAZOP meetings

  • Preparation of construction scope of work and answer bidder technical queries

  • As-built the project drawings / documentation.

 

Action of electrical equipments in hazardous area :

  • Designing supply change over schemes for incoming and outgoing feeder control schemes

  • Selection of feeder /motor / transformer protection relays

  • Switchyard / transformer layouts

  • Switchgear / MCC room / battery room layout

  • Cable tray / trench layouts

  • Cable routing/ earthing layouts

  • Lighting (indoor/outdoor) layouts

  • Lightning protection layouts

  • Power and control cable schedules and cable drum schedules

  • SCADA I/O list

  • Interface activities with civil / machinery / instrumentation

  • Electrical data input for packaged equipments

  • Requisition/specifications for HV/LV switchgear, motor control centre, MV/LV motors, power / distribution transformers, lighting / small power distribution boards, AC / DC UPS, lighting fixtures, power / control cables, cable trays, earthing materials, etc.

  • Bill of quantities for bulk materials

  • Standard installation drawings for power system, earthing system, lighting system and cable tray/ladders, etc.

  • Review of vendor bids and issue technical bid analysis

  • Review of vendor drawings and issue of approvals for manufacturing

  • Preparation of interconnection diagrams between various equipments

  • Attending SAFOP / HAZOP meetings

  • Preparation of construction scope of work and answer bidder technical queries

  • As-built the project drawings / documentation.

  • Mining

     

           We’ve commenced mining business in this year2011, iron ore was the first of our production followed by copper ore, Chrome ore, Gypsum and Magnesium respectively. Manganese is already discovered and we’re in process for mass production. Table (1-1) gives brief information about our current production. In house reports (assayed by the Captive lab of the National Ministry of Minerals) are available as well.

  •  

    Sr.No

     

    Metal name

     

    Specification

     

    Mines Location

    Tentative Monthly  Production

    MT

     

    Remark

    1.        

     

    Iron ore

     

    65% Up

    North-East Sudan

    10000-15000

    Magnetite

    2.        

    Copper ore

    35% Up

    Middle  Sudan

    700-1000

    Oxide

    3.        

     

    Chrome ore

     

    40% Up

    East-South Sudan

     

    1000-2000

    Oxide

    4.        

    Magnesium ore

     

    62% Up

    East-South Sudan

     

    1000-1500

     

    5.        

    Gypsum ore

     

    98%Up

    East-South Sudan

    3000-5000