WE providing the following details :
Load flow studies
Selection of HV/LV switchgear, motor control centers
Selection of AC/DC UPS
Selection of power / distribution transformers
Selection of electrical equipments in hazardous area
Designing supply change over schemes for incoming and outgoing feeder control schemes
Selection of feeder /motor / transformer protection relays
Switchyard / transformer layouts
Switchgear / MCC room / battery room layout
Cable tray / trench layouts
Cable routing/ earthing layouts
Lighting (indoor/outdoor) layouts
Lightning protection layouts
Power and control cable schedules and cable drum schedules
SCADA I/O list
Interface activities with civil / machinery / instrumentation
Electrical data input for packaged equipments
Requisition/specifications for HV/LV switchgear, motor control centre, MV/LV motors, power / distribution transformers, lighting / small power distribution boards, AC / DC UPS, lighting fixtures, power / control cables, cable trays, earthing materials, etc.
Bill of quantities for bulk materials
Standard installation drawings for power system, earthing system, lighting system and cable tray/ladders, etc.
Review of vendor bids and issue technical bid analysis
Review of vendor drawings and issue of approvals for manufacturing
Preparation of interconnection diagrams between various equipments
Attending SAFOP / HAZOP meetings
Preparation of construction scope of work and answer bidder technical queries
As-built the project drawings / documentation.
Action of electrical equipments in hazardous area :
Designing supply change over schemes for incoming and outgoing feeder control schemes
Selection of feeder /motor / transformer protection relays
Switchyard / transformer layouts
Switchgear / MCC room / battery room layout
Cable tray / trench layouts
Cable routing/ earthing layouts
Lighting (indoor/outdoor) layouts
Lightning protection layouts
Power and control cable schedules and cable drum schedules
SCADA I/O list
Interface activities with civil / machinery / instrumentation
Electrical data input for packaged equipments
Requisition/specifications for HV/LV switchgear, motor control centre, MV/LV motors, power / distribution transformers, lighting / small power distribution boards, AC / DC UPS, lighting fixtures, power / control cables, cable trays, earthing materials, etc.
Bill of quantities for bulk materials
Standard installation drawings for power system, earthing system, lighting system and cable tray/ladders, etc.
Review of vendor bids and issue technical bid analysis
Review of vendor drawings and issue of approvals for manufacturing
Preparation of interconnection diagrams between various equipments
Attending SAFOP / HAZOP meetings
Preparation of construction scope of work and answer bidder technical queries
As-built the project drawings / documentation.
Mining
We’ve commenced mining business in this year2011, iron ore was the first of our production followed by copper ore, Chrome ore, Gypsum and Magnesium respectively. Manganese is already discovered and we’re in process for mass production. Table (1-1) gives brief information about our current production. In house reports (assayed by the Captive lab of the National Ministry of Minerals) are available as well.
Sr.No |
Metal name |
Specification |
Mines Location |
Tentative Monthly Production MT |
Remark |
1. |
Iron ore |
65% Up |
North-East Sudan |
10000-15000 |
Magnetite |
2. |
Copper ore |
35% Up |
Middle Sudan |
700-1000 |
Oxide |
3. |
Chrome ore |
40% Up |
East-South Sudan |
1000-2000 |
Oxide |
4. |
Magnesium ore |
62% Up |
East-South Sudan |
1000-1500 |
|
5. |
Gypsum ore |
98%Up |
East-South Sudan |
3000-5000 |
|